Kenter-type joining link
Provide After-Sales Service
Provide After-Sales Service
as Per Drawings
as Per Drawings
30days
Casting
NORD
Wooden Package After Mandatory Treatment or Other
Agricultural Machinery Parts Hammer
Ningbo China
Product Description
Accurate in reading drawings & Fast in delivery & Exact dimension control & 100% quality control & OEM Service & Strict material inspection & Prompt quote & lead time guarantee
The Kenter-type joining link contains two half links, one center block and a taper pin with a lead plug. The two main halves have numbers to be matched and arrows to be lined up for ease of assembly with the third piece (stud). The two main parts are attached to the ends of the chain in a vertical position and then fitted together (1), and the stud is then slid into place (2), which locks the link. The stud is secured by hammering a tapered pin into the hole drilled diagonally (3) through all three parts of the joining link. This hole is tapered, and when the pin is driven home, a small conical recess (called the "dovetail chamber") is left clear above its head. A lead pellet is hammered broad end first into this chamber (4) so as to fill it completely and thereby keep the pin in place.
Precaution must be used to prevent flat, small pieces of lead from flying off the joining link into the face or eyes. Prior to assembly, the internal mating surfaces should be coated with a molybdenum disulphide grease (MIL-G-23549) or an equivalent lithium based grease. When assembling and before inserting the new lead, any remaining lead must be reamed out. When dissembling, the locking pin is driven out with a "drift". To part the link, a top swage (shaped to the curvature of the link) must always be used between the hammer and link so as to avoid damaging the machined surfaces.

2. Material: | Carbon Steel, Alloy Steel, Stainless Steel,Tooling Steel |
3.Material Standard: | ASTM,AISI,ASME,SAE,NF EN,DIN EN,ISO,,BS EN,SS,etc. |
4. Items: | FOB Ningbo or Shanghai,China |
5. Lead time: | 30~40 days |
6. Place of origin | Ningbo, China |
7. Software for specification drawings: | PDF, Auto CAD, Solidworks, JPG, ProE,etc. |
8. Main production equipments: | 2 set of 1 ton forging hammer, 1 set of 3 ton forging hammer, 1set of 5 ton forging hammer, 1set of 3000ton and 1 set of 7800ton oil press hammers, CNC-machine-center, Lathe, Milling machine,Drilling machine, Boring Lathe,Grinding Machine, Heat treatment Furnace. |
9.Heat Treatment Machine: | Mesh-Belt-Furnace,Carburizing Quench Furnace,Chamer Furnace,etc. |
10.Surface Treatment: | Cold/Hot Zn Plating,Blackening Treatment(Salt Spray Test 48-96 hours),Ni Plating, Cr Plating,Spraying Undercoat,Anti-Rust Paint,Surface Paint,Plastic Paint, Coated Anti-Rust Water,Anti-oil,etc. |
11.Surface Heat Treatment: | Medium Frequence Quenching,High Frequence Quenching and Carburizing and Quenching,Oil Quenching,Water quenching,Normalizing,Temper,Annealing,etc. |
12.Dimension Inspection: | Calipers,Height Laugue,Micrometer Calipers,Inside Caliper Gauge,Angle and R Gauge,Three coordinates measuring instrument. |
13. Productivity: | 50000 pcs / year |
14. Packaging: | Wooden package after mandatory treatment or other |
15. They are using for steamship mining equipment,Construction equipment, Agricultural equipment,Train,Truck and others. | |
16. We make Open die forging and Closed die forging in Ningbo, China | |
If you have any other question, please feel free to contact us. |
The Kenter-type joining link contains two half links, one center block and a taper pin with a lead plug. The two main halves have numbers to be matched and arrows to be lined up for ease of assembly with the third piece (stud). The two main parts are attached to the ends of the chain in a vertical position and then fitted together (1), and the stud is then slid into place (2), which locks the link. The stud is secured by hammering a tapered pin into the hole drilled diagonally (3) through all three parts of the joining link. This hole is tapered, and when the pin is driven home, a small conical recess (called the "dovetail chamber") is left clear above its head. A lead pellet is hammered broad end first into this chamber (4) so as to fill it completely and thereby keep the pin in place.
Precaution must be used to prevent flat, small pieces of lead from flying off the joining link into the face or eyes. Prior to assembly, the internal mating surfaces should be coated with a molybdenum disulphide grease (MIL-G-23549) or an equivalent lithium based grease. When assembling and before inserting the new lead, any remaining lead must be reamed out. When dissembling, the locking pin is driven out with a "drift". To part the link, a top swage (shaped to the curvature of the link) must always be used between the hammer and link so as to avoid damaging the machined surfaces.

