Share Categories Channel

1/6
ISO BV CCS Class Certificated 20/40 Foot 36ton Manual Operate Automatic Container Spreader Beam image 1ISO BV CCS Class Certificated 20/40 Foot 36ton Manual Operate Automatic Container Spreader Beam image 2ISO BV CCS Class Certificated 20/40 Foot 36ton Manual Operate Automatic Container Spreader Beam image 3ISO BV CCS Class Certificated 20/40 Foot 36ton Manual Operate Automatic Container Spreader Beam image 4ISO BV CCS Class Certificated 20/40 Foot 36ton Manual Operate Automatic Container Spreader Beam image 5ISO BV CCS Class Certificated 20/40 Foot 36ton Manual Operate Automatic Container Spreader Beam image 6

ISO BV CCS Class Certificated 20/40 Foot 36ton Manual Operate Automatic Container Spreader Beam

Shanghai Enjue Machinery Equipment Co., Ltd.

Price $8000.00 / Piece
Mini Order
-+Subtotal: $80000
Availability In Stock
Purchase details

Payments:

Returns&Refunds:

Eligible for returns and refunds View More

20feet/36TON
2 Years
2 Years
Customized
Semi-Automatic
30days
Shanghai Port
2.2t
China Enjue
Nude Package or as Your Required
20ft or 40ft
China
843141000
Product Description
 ISO container lifting beam/ full  Automatic container spreader without power/20feet 40feet semi automatic container lifting frame container spreader
Type SWLDead Weight
20feet  Container spreader25-35T1.2-2.6T
40feet  Container spreader32-45T3.0-3.5t
Automatic container spreader without power
The spreader is equipped on 40t gantry crane to load and unload containers. The spreader is light, no power, easy to operate and cheap. There are two kinds of spreader 32t-20' and 40t-40'.
Operation: first put the four main lifting ropes riggings of the spreaders and one turning stretch wire rope in the hook of the gantry crane. Before lifting, the guider points to open direction. By the localizers at the four sides of the spreader and the skilled operation, the four turning locks of spreader are locked into the corner, and then the hook is started slowly.  The stretch wire rope is firstly tight to pull turning mechanism and turn the turning lock in 90°and be closed, and then keep lifting the hook .The container is lifted.
Lay container down: After hanging containers to be scheduled position, keep the hook fall about 1-2m and then lift the hook again. Before the main lifting wire rope is dragged, lift turning rope to make turning lock back to open position and lift the hook to depart the spreader and container .By now the operation is finished.
Maintenance: The link pole of the spreader and turning mechanism should be opened to check regularly and add lubricating oil to make every part turn fluently. If there are obvious damages and distortion, spreader and wire rope should stop work at once.






                                           About US:




Send Message

Content*

Your Name

Tel*

Email*

Shop Cart