Share Categories Channel
1/6
60m3 LNG Storage Tank Trailer for Sale image 160m3 LNG Storage Tank Trailer for Sale image 260m3 LNG Storage Tank Trailer for Sale image 360m3 LNG Storage Tank Trailer for Sale image 460m3 LNG Storage Tank Trailer for Sale image 560m3 LNG Storage Tank Trailer for Sale image 6

60m3 LNG Storage Tank Trailer for Sale

Shandong Chengda Auto Sales Co., Ltd.

Price $15000.00 / Piece
Mini Order
-+Subtotal: $150000
Availability In Stock
Purchase details

Payments:

Returns&Refunds:

Eligible for returns and refunds View More

LNG storage tank
Semi Trailer
30T
ISO9001, CCC
7000-8000mm
2240mm
Medium Duty
Multi-link Type
Flatbed
3
12
Steel
New
42000L
Fuwa 13ton Axle
90mm/50mm
2 Pieces
1 Standard
Chengshida
Nude
CCC, ISO, WMI, BV
China
8716900000
Product Description

Partial List of Vacuum Cryogenic Storage Tanks




 

Plate Bending Machine

W11

4

3.0

Acceptable

Submerged Arc Machine

MZ-1000

4

2.0

Acceptable

Welding Machine

NBC-500

50

3.0

Acceptable

Chamfering Machine

BBJ-12

1

3.0

Acceptable

Drilling Machine 1

ZQ3080

5

3.0

Acceptable

Lathe 1

CW61100

1

3.0

Acceptable

Small Vertical Lathe

C512A

2

3.0

Acceptable

Large Vertical Lathe

CY5112

1

2.0

Acceptable

Lathe 2

CQ5250-Y

1

2.0

Acceptable

Drilling Machine 2

GXK2020BU

1

2.0

Acceptable

Thread Rolling Machine

Z28-100

1

2.0

Acceptable

Resistance Furnace

RT

1

3.0

Acceptable

Shearing Machine

QC12Y

1

3.0

Acceptable

Grinding Machine

M1332B

2

3.0

Acceptable

Milling Machine

X50A

5

3.0

Acceptable

 
Testing Machinery:

Machine Name

Brand & Model No.

Quantity

Number of Year(s) Used

Condition

Micrometer

500-600mm

5

3.0

Acceptable

Universal Testing Machine

WE-60

1

3.0

Acceptable

Constant Temperature Drying Oven

101

1

3.0

Acceptable

Vernier Caliper

100cm

10

2.0

Acceptable

Box-type Resistance Furnace

SX2

1

3.0

Acceptable

Photometer

72

1

3.0

Acceptable

Impact Testing Machine

JB-300B

1

2.0

Acceptable

 
 
PRODUCTION PROCESS OF STORAGE TANKS
 
1). cutting materials
2). rolling machines for circling
3). welding and NDT inspection
4). re-circling after welding
5). outer vessel's abrasive blasting and anticorrosive painting for outside surface
6). pipe connecting and assembly of inner vessel and outer vessel
7). valves installation
8). perlite filling
9). vacuum-pumping
10). final painting and ready for shipment

Send Message

Content*

Your Name

Tel*

Email*

Shop Cart