SII-BR221
Mezzanine Floor Racking System
Steel
Custom as Requirement
Design as Requirement
2-Way
Mezzanine Floor System
Anti-Static
Industrial, Supermarket, Garment, Beverage, etc.
Blue, Grey, Orange, etc.
Upright, Beam, Bracing, Crane
Adjustable
Ocean Sea Shipment
SIMPLY
Export Standard Carton, Wooden or Steel Pallet
Custom As Requirement
China
73089000
Product Description
Heavy Cargo Racking System Mezzanine Builders Steel Racking
Mezzanine Floor System is usually using medium pallet rack or heavy duty rack as the main support plus the floor panel (depending on the total load weight of the shelf unit to decide which shelf to choose).
The floor panel is usually selected from Cold Rolled Steel floor, Patterned Steel floor or Steel Grating floor.

Specification
Basic Components
Please provide information for quick quotation
1. Mezzanine's net height and a bearing weight per square
2. The horizontal and vertical span requirements of the attic
3. Warehouse's size (length*width*height)
4. Paving floor requirements (wood, steel, steel gussets, grille mesh, etc.)
5. Is there a fire hydrant, fire hose
6. Whether the installation site is installed on the first floor. If not, the second floor is walking stairs or the elevator (needs to measure the elevator's length)
7. Logistics channel towards
8. Is it a flat warehouse floor
Mezzanine Floor System is usually using medium pallet rack or heavy duty rack as the main support plus the floor panel (depending on the total load weight of the shelf unit to decide which shelf to choose).
The floor panel is usually selected from Cold Rolled Steel floor, Patterned Steel floor or Steel Grating floor.

Specification
Item | Heavy Cargo Racking System Mezzanine Builders Steel Racking |
Item No.: | SII-BR221 |
Type: | Mezzanine Floor Racking System |
Rack Bearing Capacity: | About 150-200kgs/level--------Light Warehouse Rack About 200-600kgs/level--------Middle Warehouse Rack About ≥1000kgs/level------Heavy Duty Rack |
Material: | Q235B Cold-Roll Steel |
Surface Finish: | Powder Coating |
Size: | Custom As Requirement |
Component: | Upright, Beam, Bracing, Crane |
Supply Ability: | 300-400 ton per month |
Sample Time: | About 7-10 working days |
Semi-Open: | The layer pallet can't be pulled out all of them |
Fully-Open: | The layer pallet can be pulled out all of them |
Basic Components
Features
1. Goods are usually sent to the second and third floors by forklifts, hydraulic lifts or freight elevators, and then sent to a certain location by light trolleys or hydraulic pallet trucks.
2. Applicable to the case of high warehouse, small cargo, manual access, and large storage.
Custom Whole Process
Packing Details
Why Choose Us
Please provide information for quick quotation
1. Mezzanine's net height and a bearing weight per square
2. The horizontal and vertical span requirements of the attic
3. Warehouse's size (length*width*height)
4. Paving floor requirements (wood, steel, steel gussets, grille mesh, etc.)
5. Is there a fire hydrant, fire hose
6. Whether the installation site is installed on the first floor. If not, the second floor is walking stairs or the elevator (needs to measure the elevator's length)
7. Logistics channel towards
8. Is it a flat warehouse floor