Model NO.
sc200/200; sc100/100; sc200; sc100; sc150
Lift Mechanism
Rack and Gear
Attendant
With Attendant
Deceleration Device
With Deceleration Device
Elevator Door
Straight Fractional Door
Motor Power
2X13kw Per Cage
Mast Section Weight
145-180kg (Double Racks)
Cage Dimension
3*1.5*2.2m, 3*1.3*2.2m, 3.2*1.5*2.2m(Changeable )
Rated Lifting Speed
60m/Min
Mast Section Size
650X650X1508mm (or 800X800X1508mm)
Max Erection Height
250m
Main Electrical System
Schneider(Can Be Equipped with PLC Fault Sensor )
Wall-Tie Adjust Length&Qty
2.8-3.2m 1pieces/5 Mast (Can Be Adjusted)
Cage
Double Cage(with Operation Cabin or No Cabin)
Transport Package
Container
Specification
SC100, SC200, SC150, SC100Z, SC150Z, SC200Z
Trademark
XINGDOU
Origin
China
HS Code
84281090
Production Capacity
1000sets / Year
Type:
Rack and Gear
Load Capacity:
<1T
Speed:
40M/Min - 60M/Min
Usage:
Construction Hoist
Sling Type:
Chain
Lift Drive / Actuation:
Electric Motor
SC200/200 500M Construction Hoist/Building Lift/Rack and Pinion elevator/Construction Elevator
Technicaldata(OEM)
Product Type | Model | Lifting Speed(m/min) | Max Height(m) | Drive Unit | Safety Device | Electronic Control Systerm |
Direct driving PLC | SC100/100 | 33 m/min | 150m | 2*11KW | SAJ30-1.2 | PLC |
SC150/150 | 33 m/min | 150m | 2*15KW | SAJ40-1.2 | PLC | |
SC200/200 | 33 m/min | 150m | 3*11KW | SAJ40-1.2 | PLC | |
Low Speed VFD | SC100/100L | 0-40 m/min | 250m | 2*11KW | SAJ40-1.2 | 30KW VFD |
SC150/150L | 0-40 m/min | 250m | 2*13KW | SAJ40-1.2 | 30KW VFD | |
SC200/200LA | 0-33 m/min | 250m | 2*13KW | SAJ40-1.2 | 30KW VFD | |
SC200/200LB | 0-40 m/min | 250m | 2*15KW | SAJ40-1.2 | 37KW VFD | |
SC200/200LC | 0-46 m/min | 250m | 3*11KW | SAJ40-1.2 | 37KW VFD | |
Mid Speed VFD | SC200/200MA | 0-55 m/min | 350m | 2*19KW | SAJ40-1.4 | 45KW VFD |
SC200/200MB | 0-60 m/min | 350m | 2*23KW | SAJ40-1.4 | 55KW VFD | |
SC200/200MC | 0-63 m/min | 350m | 3*15KW | SAJ50-1.4 | 55KW VFD | |
SC200/200MD | 0-72 m/min | 350m | 3*19KW | SAJ50-1.6 | 75KW VFD | |
High Speed VFD | SC200/200HA | 0-80 m/min | 450m | 3*23KW | SAJ50-1.6 | 75KW VFD |
SC200/200HB | 0-90 m/min | 450m | 3*26KW | SAJ50-2.0 | 90KW VFD | |
SC200/200HC | 0-100 m/min | 450m | 3*32KW | SAJ50-2.0 | 110KW VFD | |
SC200/200HD | 0-120 m/min | 550m | 3*19KW | SAJ50-2.4 | 75KW VFD |
Special design for Cage:
1. bottom and roof of Cage adopt trapezoidal frame
2. Bottom and the roof are full symmetry
3. The plane of symmetry are connected by Bending plate, Bending channel and square pipe which make it firm, straight and balance in use.
4. The wall around cage can be fixed by Punched Aluminium plate, Punched zinc plate, steel wire mesh.
5. Surface Treatment: Blasting, Baking finished,Galvanized
For more info of customized service, pleass contact us:
Send Message